CaGrid/TeraGrid/geWorkbench Integration Deliverables Schedule

From Informatics

Jump to: navigation, search

Home | Requirements | Documents & Links | Design | Deliverables | Contacts


# Deliverable Due Date Pointer to Deliverable Other
1 Draft Requirements/Specification Document (Task 4.1) 11/30/07 Draft SRS
2 Draft Requirements Traceability Matrix (Task 4.2) 11/30/07 Draft Traceability Matrix
3 Final Requirements/Specification Document (Task 4.1) 12/15/07 Final SRS
4 Final Requirements Traceability Matrix (Task 4.2) 12/15/07 Final Traceability Matrix
5 Pointers to Proof-of-Concept Code in CVS (Task 4.3) 1/28/08 geworkbench-teragrid-source

Gateway Service Source

6 Proof-of-Concept demonstrating geWorkbench interfacing with TeraGrid resources presented at Joint Arch/VCDE F2F (Task 4.3) 1/28/08 Proof-of-Concept
7 Draft Documentation detailing a generalizable process to interface with TeraGrid (Task 4.5) 2/15/08 Draft Best Practices
8 Testing Documentation (Task 4.4) 2/29/08 Final Best Practices
9 Final Documentation detailing a generalizable process to interface with TeraGrid (Task 4.5) 2/29/08 Testing Docs
Personal tools