CaGrid/TeraGrid/geWorkbench Integration Deliverables Schedule
From Informatics
< CaGrid
Home | Requirements | Documents & Links | Design | Deliverables | Contacts |
# | Deliverable | Due Date | Pointer to Deliverable | Other |
---|---|---|---|---|
1 | Draft Requirements/Specification Document (Task 4.1) | 11/30/07 | Draft SRS | — |
2 | Draft Requirements Traceability Matrix (Task 4.2) | 11/30/07 | Draft Traceability Matrix | — |
3 | Final Requirements/Specification Document (Task 4.1) | 12/15/07 | Final SRS | — |
4 | Final Requirements Traceability Matrix (Task 4.2) | 12/15/07 | Final Traceability Matrix | — |
5 | Pointers to Proof-of-Concept Code in CVS (Task 4.3) | 1/28/08 | geworkbench-teragrid-source | — |
6 | Proof-of-Concept demonstrating geWorkbench interfacing with TeraGrid resources presented at Joint Arch/VCDE F2F (Task 4.3) | 1/28/08 | Proof-of-Concept | — |
7 | Draft Documentation detailing a generalizable process to interface with TeraGrid (Task 4.5) | 2/15/08 | Draft Best Practices | — |
8 | Testing Documentation (Task 4.4) | 2/29/08 | Final Best Practices | — |
9 | Final Documentation detailing a generalizable process to interface with TeraGrid (Task 4.5) | 2/29/08 | Testing Docs | — |